Home  •  How the Transmission System Works  •  Webcast  •  Studies & Reports  •  Projects  •  Contact Us 
Planning Zones

Northwest Zone
Northeast Zone
West Central Zone
Twin Cities Zone
Southwest Zone
Southeast Zone

MN Counties (large map)

Sponsoring Utilities
American Transmission Company
Dairyland Power Cooperative
East River Electric Power Cooperative
Great River Energy
ITC Midwest
L&O Power Cooperative
Minnesota Power
Minnkota Power Cooperative
Missouri River Energy
Otter Tail Power Company
Rochester Public Utilities Commission
Southern Minnesota
Municipal Power Agency
Xcel Energy
Participating Government Agencies
Minnesota Public Utililities Commission
Minnesota Department of Commerce
Environmental Quality Board
Related Links
North American Electric Reliability Council
Midcontinent ISO
National Electric Safety Code
US Department of Energy
CapX2020.com

Studies and Reports > 2009 MN Biennial Report > NE Planning Zone > Needs: 6.3.22 Shell Lake Area

To inquire about this project, click here.


Transmission Projects Report 2009
Section 6.3: Northeast Zone
 
p. 129

6.3.22 Shell Lake Area

Tracking Number: 2009-NE-N9

Utility: Great River Energy

Inadequacy: GRE member cooperative Itasca-Mantrap Cooperative Electrical Association has requested interconnection of a new Shell Lake distribution substation on the west side of its service territory. The existing distribution system cannot reliably serve the area load growth.

A map of the area is shown on the following page.

Alternatives. The Osage-Pine Point 34.5 kV line offers the only source to this area. The load delivery point is expected to be between three and five miles from this facility.

Analysis. This is the least cost distribution plan in the Itasca-Mantrap analysis. GRE is obligated to provide a source to the new distribution site whereby the Osage-Pine Point line is the nearest and only viable line to interconnect the new substation. Any transmission to this area will be constructed to 115 kV standards for potential future conversion (see Park Rapids Area, Tracking Number 2009-NE-N7).

Schedule. GRE will coordinate with the Itasca-Mantrap Cooperative to see when the new substation needs to be energized. The best estimate is that the new facilities will be required in 2015.

 


Transmission Projects Report 2009
Section 6.3: Northeast Zone
 
p. 130

Click here or on map below to download high resolution PDF map.