Home  •  How the Transmission System Works  •  Webcast  •  Studies & Reports  •  Projects  •  Contact Us 
Planning Zones

Northwest Zone
Northeast Zone
West Central Zone
Twin Cities Zone
Southwest Zone
Southeast Zone

MN Counties (large map)

Sponsoring Utilities
American Transmission Company
Central Minnesota Power Agency/Services
Dairyland Power Cooperative
East River Electric Power Cooperative
Great River Energy
ITC Midwest
L&O Power Cooperative
Minnesota Power
Minnkota Power Cooperative
Missouri River Energy
Otter Tail Power Company
Rochester Public Utilities Commission
Southern Minnesota
Municipal Power Agency
Xcel Energy
Participating Government Agencies
Minnesota Public Utililities Commission
Minnesota Department of Commerce
Environmental Quality Board
Related Links
North American Electric Reliability Council
Midcontinent ISO
National Electric Safety Code
US Department of Energy
Grid North Partners (successor to CapX2020)

Studies and Reports > 2009 MN Biennial Report > Southwest Planning Zone

To inquire about this project, click here.


Transmission Projects Report 2009
Section 6.6: Southwest Zone
 
p. 227

6.6 Southwest Zone

The following table provides a list of transmission needs identified in the Southwest Zone and the map following the table shows the location of each item in the table. Each need is discussed in the sections following the map.

   

Map ID

Tracking Number
Description
Projected In-Service Year
Need Driver
Section No.
A
2003-SW-N2
2009
St. James low voltage
6.6.2
B
2005-SW-N1
2007
Reliability; Line overloads
6.6.3
C
2005-CX-1
6.6.4
D
2007-SW-N1
2010
130 MW IPP wind interconnection
6.6.5
E
2007-SW-N2
2010
Load growth and new ethanol plants
6.6.6
F
2007-SW-N3
2010
Request firm network transmission service
6.6.7
G
2009-SW-N1
2012
Low voltage along 69 kV system
6.6.8
H
2009-SW-N2
Load Serving
6.6.9
I
2009-SW-N3
System Upgrade Generation Outlet
6.6.10
J
2009-SW-N4
2011
Load Growth
6.6.11

Gray shading denotes project not located on map because it encompasses too large an area.

Click on a letter in the map to see project information. Click here for enlarged view of map

St. James Area


Map ID: A
Tracking No. 2003-SW-N2
Projected in-service: 2009
Need: Low voltage in St. James area
Section No. 6.6.2
Project Information
Contact Us

Worthington Area


Map ID: B
Tracking No. 2005-SW-N1
Projected in-service: 2007
Need: Increase reliability; decrease line overloads
Section No. 6.6.3
Project Information
Contact Us

Storden Wind Generation Interconnection


Map ID: D
Tracking No. 2007-SW-N1
Projected in-service: 2010
Need: 130 MW wind interconnection
Section: 6.6.5
Project Information
Contact Us

Dotson Area Load Serving


Map ID: E
Tracking No. 2007 SW-N2
Projected in-service: 2010
Need: Load growth and ethanol plant connection
Section: 6.6.6
Project Information
Contact Us

New Ulm Transmission Service


Map ID: F
Tracking No. 2007-SW-N3
Projected in-service: 2010
Need: Firm network transmission connection
Section No. 6.6.7
Project Information
Contact Us

Fulda-Magnolia


Map ID: G
Tracking No. 2009-SW-N2
Projected in-service: TBD
Need: Load serving in Fulda and Magnolia areas
Section No. 6.6.9
Project Information
Contact Us

Fenton 69 kV interconnection


Map ID: H
Tracking No. 2009-SW-N1
Projected in-service: 2012
Need: Low voltage along 69-kV system
Section No. 6.6.8
Project Information
Contact Us

Lakefield-Adams 345-kV system upgrade


Map ID: I
Tracking No. 2009-SW-N3
Projected in-service: TBD
Need: System upgrade and wind generation interconnection
Section No. 6.6.10
Project Information
Contact Us

Redwood Falls load serving substation


Map ID: J
Tracking No. 2009-SW-N4
Projected in-service: 2011
Need: Load growth in Redwood Falls area
Section No. 6.6.11
Project Information
Contact Us


6.6.1 Completed Projects

Some inadequacies in the Southwest Zone that were identified in the 2007 Biennial Report were alleviated through the construction and completion of specific projects over the last two years. Information about each of the completed projects is summarized briefly in the table below, and those matters will be removed from the list of inadequacies that are discussed in the 2009 Report. More detailed information about these projects and inadequacies can be found in the 2007 Report and in the PUC Docket for the matter if the project fell within the jurisdiction of the Public Utilities Commission, in which case the Docket Number is shown below. Also, additional information is available by contacting the designated person for the utility that was responsible for constructing the project.
   
Tracking Number
Utility
Description
PUC Docket
Date Completed
2003-SW-N4
Xcel Energy
Wind Generation Outlet Four new transmission lines in the Buffalo Ridge area
CN-01-1958 Routes permitted by Environmental Quality Board
2008 Three 115kV lines complete, 345kV line was energized in mid2008.
2003-SW-N1
Xcel Energy
Jackson Area New 161 kV substation in Jackson
None
September 2009
2003-SW-N3
Xcel Energy
Marshall Area A new 115 kV line from Lake Yankton to a new Marshall Southwest sub
CN-06-154
July 2009
2005-SW-N2
Xcel Energy
BRIGO Three new 115 kV lines for Buffalo Ridge generation outlet
CN-06-154
2009