1.0 Executive Summary |
1 |
2.0 Biennial Report Requirements |
5 |
|
2.1 Generally |
5 |
|
2.2 Reporting Utilities |
7 |
|
2.3 Certification Requests |
8 |
|
2.4 General Impacts |
8 |
|
2.5 Renewable Energy Standards |
10 |
|
2.6. Distribution Report/Grid Modernization |
10 |
|
2.7. Non-Wire Alternatives |
11 |
|
2.8. FERC, MISO and Commission Actions Related to Distributed Energy Resources and Distribution Planning |
15 |
|
2.9 MISO and Minnesota's Transmission Needs |
19 |
3.0 Transmission Studies |
22 |
|
3.1 Introduction |
22 |
|
3.2 Completed Studies |
22 |
|
3.3 Regional Studies |
23 |
|
3.4 Load Serving Studies |
25 |
4.0 Public Participation |
27 |
|
4.1 Public Involvement in Transmission Planning |
27 |
|
4.2 MISO Transmission Planning |
27 |
|
4.3 MTO Website |
28 |
|
4.4 Efforts to Involve the General Public and Local Officials on Specific Projects |
28 |
5.0 Transmission Planning Zones |
30 |
|
5.1 Introduction |
30 |
|
5.2 Northwest Zone |
31 |
|
5.3 Northeast Zone |
32 |
|
5.4 West Central Zone |
33 |
|
5.5 Twin Cities Zone |
34 |
|
5.6 Southwest Zone |
35 |
|
5.7 Southeast Zone |
36 |
6.0 Needs |
38 |
|
6.1 Introduction |
38 |
|
6.2 The MISO Planning Process |
40 |
|
6.3 Northwest Zone |
44 |
|
6.4 Northeast Zone |
56 |
|
6.5 West Central Zone |
107 |
|
6.6 Twin Cities Zone |
134 |
|
6.7 Southwest Zone |
172 |
|
6.8 Southeast Zone |
188 |
7.0 Transmission-Owning Utilities |
203 |
|
7.1 Introduction |
203 |
|
7.2 American Transmission Company, LLC |
205 |
|
7.3 Central Minnesota Municipal Power Agency |
206 |
|
7.4 Dairyland Power Cooperative |
207 |
|
7.5 East River Electric Power Cooperative |
208 |
|
7.6 Great River Energy |
209 |
|
7.7 ITC Midwest LLC |
210 |
|
7.8 L&O Power Cooperative |
211 |
|
7.9 Minnesota Power |
212 |
|
7.10 Minnkota Power Cooperative |
213 |
|
7.11 Missouri River Energy Services |
214 |
|
7.12 Northern States Power Company |
215 |
|
7.13 Otter Tail Power Company |
216 |
|
7.14 Rochester Public Utilities |
217 |
|
7.15 Southern Minnesota Municipal Power Agency |
218 |
8.0 Renewable Energy Standards |
219 |
|
8.1 Introduction |
219 |
|
8.2 Reporting Utilities |
220 |
|
8.3 Compliance Summary |
220 |
|
8.4 Gap Analysis |
221 |
|
8.5 Base Capacity and RES/REO Forecast |
221 |
|
8.6 Solar Energy Standard |
224 |
|
8.7 Gap Analysis Summary |
225 |
9.0 Outages & Congestion |
226 |
|
9.1 Introduction |
226 |
|
9.2 System Changes and Upcoming Projects Addressing Congestion Relief |
226 |
|
9.3 Planned Outages |
228 |
| 9.4 Potential Congestion Based on Future Facility Additions |
228 |
Appendix A: NERC 2022 Long-Term Reliability Assessment-December 2020 (excerpt) |
Appendix B: Congestion Study |